Loading Events

« All Events

Transform Your Production with GoQ and Smart Planner

March 19, 2028

Transform Your Production with and Smart Planner

​The Ultimate ERP Solutions Designed to Optimize Precast and Concrete manufacturing
Maximize precision and efficiency across your entire production process with our advanced ERP integrated tools: GoQ and Smart Planner. Designed specifically for the precast and concrete manufacturing industry, these solutions address your most pressing challenges: scheduling conflicts, production delays, and quality non-compliance.

Unlock the Full Potential of Your Precast Operations with These Powerful Features

Smart Planner

Real-Time Production Control

Smart Planner empowers your planning team with real-time visual scheduling. Using a simple drag-and-drop interface, teams can assign tasks, adjust durations, and manage resources effortlessly—all synced instantly with Epicor ERP.

  • Instantly reschedule operations with intuitive drag-and-drop tools
  • Prevent production bottlenecks with built-in capacity & issue alerts
  • Optimize manpower and machine usage for better output
  • Export production plans to CSV for reporting and collaboration

Quality & Compliance Made Easy

ensures that every casting meets your standards. From real-time defect tracking to visual documentation, gives QA teams a full suite of tools for error-free delivery and continuous improvement

  • Log quality checks, defects & non-conformance in one place
  • Upload annotated photos/videos from the plant floor
  • Automate alerts and workflows for immediate corrective actions
  • Generate final inspection reports with full audit trails

Ready to streamline your precast operations and ensure quality compliance?
Fill out the form book your free consultation and one of our experts will get in touch to guide you through the best-fit solution for your business.

    Registration Form

    First Name :
    Last Name :
    Email :
    Organization :
    Phone No.
    Job Title :

    Industry :

    Country:

    Details

    Date:
    March 19, 2028